Harini, Sri and Astutik Suci (2017) Peer Review: Strategy of Rescheduling Project of Elevation and Roof Replacement of Granular-I NPK Plant by CPM Method (Critical Path Method) at PT. Pupuk Kujang Cikampek. Jurnal IJSER

Harini, Sri and Astutik, Suci (2018) Harini, Sri and Astutik Suci (2017) Peer Review: Strategy of Rescheduling Project of Elevation and Roof Replacement of Granular-I NPK Plant by CPM Method (Critical Path Method) at PT. Pupuk Kujang Cikampek. Jurnal IJSER. Jurnal IJSER, Malang.

[img] Text
1C. Peer Review IJSER.pdf

Download (3MB)

Abstract

Harini, Sri and Astutik Suci (2017) Peer Review: Strategy of Rescheduling Project of Elevation and Roof Replacement of Granular-I NPK Plant by CPM Method (Critical Path Method) at PT. Pupuk Kujang Cikampek. Jurnal IJSER

Item Type: Other
Subjects: L Education > L Education (General)
Depositing User: Cindy Cahyaning
Date Deposited: 27 Jul 2018 05:58
Last Modified: 27 Jul 2018 05:58
URI: http://eprints.umsida.ac.id/id/eprint/3934