Harini, Sri and Astutik, Suci (2018) Harini, Sri and Astutik Suci (2017) Peer Review: Strategy of Rescheduling Project of Elevation and Roof Replacement of Granular-I NPK Plant by CPM Method (Critical Path Method) at PT. Pupuk Kujang Cikampek. Jurnal IJSER. Jurnal IJSER, Malang.
|
Text
1C. Peer Review IJSER.pdf Download (3MB) |
Abstract
Harini, Sri and Astutik Suci (2017) Peer Review: Strategy of Rescheduling Project of Elevation and Roof Replacement of Granular-I NPK Plant by CPM Method (Critical Path Method) at PT. Pupuk Kujang Cikampek. Jurnal IJSER