Harini, Sri and Astutik, Suci (2018) Harini, Sri and Astutik Suci (2017) Peer Review: Strategy of Rescheduling Project of Elevation and Roof Replacement of Granular-I NPK Plant by CPM Method (Critical Path Method) at PT. Pupuk Kujang Cikampek. Jurnal IJSER. Jurnal IJSER, Malang.
Text
1C. Peer Review IJSER.pdf Download (3MB) |
Abstract
Harini, Sri and Astutik Suci (2017) Peer Review: Strategy of Rescheduling Project of Elevation and Roof Replacement of Granular-I NPK Plant by CPM Method (Critical Path Method) at PT. Pupuk Kujang Cikampek. Jurnal IJSER
Item Type: | Other |
---|---|
Subjects: | L Education > L Education (General) |
Depositing User: | Cindy Cahyaning |
Date Deposited: | 27 Jul 2018 05:58 |
Last Modified: | 27 Jul 2018 05:58 |
URI: | http://eprints.umsida.ac.id/id/eprint/3934 |
Actions (login required)
View Item |