izza, Anshory A Very Short-Term Load Forecasting In Time of Peak Loads Using Interval Type-2 Fuzzy Inference System: A Case Study On Java Bali Electrical System. A Very Short-Term Load Forecasting In Time of Peak Loads Using Interval Type-2 Fuzzy Inference System: A Case Study On Java Bali Electrical System.
Text
very shor term gab peer review.pdf Download (1MB) |
Item Type: | Article |
---|---|
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Depositing User: | izza anshory |
Date Deposited: | 13 May 2022 07:59 |
Last Modified: | 13 May 2022 07:59 |
URI: | http://eprints.umsida.ac.id/id/eprint/9632 |
Actions (login required)
View Item |