A Very Short-Term Load Forecasting In Time of Peak Loads Using Interval Type-2 Fuzzy Inference System: A Case Study On Java Bali Electrical System

izza, Anshory A Very Short-Term Load Forecasting In Time of Peak Loads Using Interval Type-2 Fuzzy Inference System: A Case Study On Java Bali Electrical System. A Very Short-Term Load Forecasting In Time of Peak Loads Using Interval Type-2 Fuzzy Inference System: A Case Study On Java Bali Electrical System.

[img] Text
very shor term gab peer review.pdf

Download (1MB)
Item Type: Article
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Depositing User: izza anshory
Date Deposited: 13 May 2022 07:59
Last Modified: 13 May 2022 07:59
URI: http://eprints.umsida.ac.id/id/eprint/9632

Actions (login required)

View Item View Item